Work Weekend at Bent Tree
 June 18, 1981
  | Len placing molding under the stair after the stippling is completed on the ceiling of the basement room.   |   
 Len tackles the staining and finishing of the doors.
Len sanding a closet door after staining and the first coat of clear finish. Spraying may go quickly, but sanding these slatted doors is a lot of hand work.   |   |   
  | Len has gone into production with the finishing of the closet doors and is staging the finishing.  |   
Len went into production with the staining and finishing of the doors, and knocked out most of the doors in the house in a couple of hardworking weekends.  |   |   
  | Spraying a finish clearcoat on one of the doors.   |   
 Rod works on the construction of a refreshment bar for the basement recreation room.
Assembling the frame of the basement bar. The longer section of the faceplate is attached, and I am framing for the shorter faceplate for the front of the sink portion.   |   |   
  | To make the stainable end for the bar, I glued two 1x12's together to make a solid board. The joiner came in handy for smoothing the edges before gluing.  |   
Cutting the curve in the bar top with the sabre saw.   |   |   
  | I wanted to make the bar shallow so as to minimize the space taken from the area for the ping pong table. But then I had to widen it at the end to accommodate even the tiny bar sink.   |   
This meant I had to bend the edge laminate around the curve that I had made, so I used the cutout from shaping the bar to make a custom clamp to make sure the laminate sealed well on the curve.   |   |   
  | A closer view of the curve in the edge laminate and my custom clamping arrangement.   |   
Applying the contact cement for gluing the laminate to the top of the bar.   |   |   
  | June 19 was Father's Day and Brenda had made Rod a cake to celebrate.   |   
 
 | 
Index
  1981 |